Energy efficiency solutions from EECO2 for global pharmaceutical manufacturer
Brief: Reduce energy demand without compromising on compliance
Facility: CME Warehouse – temperature and humidity controlled storage of regulated product, also include the HVAC system in the Retained Sample Store (existing R22 plant obsolete)
Issue: Very high energy demand driven by original HVAC design and layout
Brief: Reduce energy demand without compromising on compliance
Solution:
- Reduce existing air change rates
- Reduce existing fresh air volume
- Install two new VSDs to the 100kw supply air fans
- Replace the existing supply air diffusers to improve air distribution
- Use existing warehouse HVAC system to serve Retained Sample Store
- Risk based approach to mitigate potential “out of condition” impact