Energy management case study for global pharmaceutical manufacturer – Argentina
Brief: Reduce energy demand without compromising on product quality or compliance
Facility: Effervescent sachets manufacturing area – low relative humidity required
Issue: Very high energy demand driven by original HVAC design and unable to meet product-critical conditions during summer months
Brief: Reduce energy demand without compromising on product quality or compliance
Solution:
- Reduce existing air change rates
- Reduce existing fresh air volume
- Install new VSDs to the supply air fans
- Replace the existing supply air diffusers to improve air distribution
- Recommission and balance the complete manufacturing areas HVAC system
- Supported upgrade of BMS system, installation of VSDs
- Maintenance upgrade of filtration and control valve replacement
- Completed product risk assessments, Engineering Change Control documentation and all required regulatory documentation covering the changes