Energy management case study for global pharmaceutical manufacturer – Argentina

Published: 7-Sep-2012

Brief: Reduce energy demand without compromising on product quality or compliance


Facility: Effervescent sachets manufacturing area – low relative humidity required

Issue: Very high energy demand driven by original HVAC design and unable to meet product-critical conditions during summer months

Brief: Reduce energy demand without compromising on product quality or compliance

Solution:

  • Reduce existing air change rates
  • Reduce existing fresh air volume
  • Install new VSDs to the supply air fans
  • Replace the existing supply air diffusers to improve air distribution
  • Recommission and balance the complete manufacturing areas HVAC system
  • Supported upgrade of BMS system, installation of VSDs
  • Maintenance upgrade of filtration and control valve replacement
  • Completed product risk assessments, Engineering Change Control documentation and all required regulatory documentation covering the changes

Relevant companies

You may also like