Cleanroom Solutions
Trending Articles
Related Content
Design & Build
Case study: ISO Class 8 mask production facility
The urgency of pandemic builds means extremely tight turnaround demands for design and build providers. An example of this is the new 425 sqm cleanroom in Wales that aimed to produce high grade face coverings and masks for front line workers
You need to be a subscriber to read this article.
Click here to find out more.
Click here to find out more.
Design & Build
A clinical build for consumables production
Cleanroom Solutions was chosen to design and build a cleanroom complex in Helapet’s new headquarters, consisting of two separate cleanrooms sandwiched between a packing room. Each cleanroom has its own fully equipped changing room and separate air conditioning system. The rooms operate with a positive pressure and the pressures are cascaded so that the cleanrooms are at a higher pressure than the changing room and the packing room
You need to be a subscriber to read this article.
Click here to find out more.
Click here to find out more.
Design & Build
Graphene facility at Exeter
The Graphene Centre cleanroom is a purpose-built semiconductor-type facility designed and built by Cleanroom Solutions at the School of Physics in Exeter to explore the possibilities of Graphene, a versatile material that offers a combination of optical, electrical and mechanical properties suitable for applications including microchips and touch screen technology. The £500,000 complex incorporates energy measures to minimise its environmental impact, notably advanced HVAC control of temperature and humidity.